SOLIHULL TOWN CENTRE ENERGY NETWORK – Early works:

As part of the energy network pipework installation, works to the Alderbrook river crossing began this week as indicated on the site plan. This work is a priority section for installation due to the Environment Agency permit that is in place which requires that this crossing is completed by 1 October 2024 to protect spawning … More SOLIHULL TOWN CENTRE ENERGY NETWORK – Early works:

BLYTHE WARD – AUGUST – MONTHLY REPORT

Local Government Boundary Commission (LGBC) update: The initial recommendations from the LGBC will be discussed at our full council in October. Our submission will be determined by them and they will submit their final recommendations to parliament for them to be formalised, possibly by the end of this year. In any event they will not … More BLYTHE WARD – AUGUST – MONTHLY REPORT

PLANNING AND DEVELOPMENT UPDATE – Blythe Ward

Here I wish to update you as to my thoughts about where we are with planning for development in Blythe ward. The draft Local Plan can be read here:  003-Draft-Submission-Plan-Incorporating-Post-Publication-Minor-Modifications-as-Tracked-Changes.pdf (solihull.gov.uk) We have three sites within the draft Local Development Plan (LDP) within Blythe ward and they are summarised below – they are detailed from … More PLANNING AND DEVELOPMENT UPDATE – Blythe Ward

SOLIHULL – INFRASTRUCTURE DELIVERY PLAN

The introduction to Solihull (Draft) Infrastructure Delivery Plan (IDF) explains it ‘…is a key component of the evidence base to support the Local Plan. The IDP provides a baseline of the existing infrastructure capacity and needs in the Borough and highlights the infrastructure requirements to support the predicted growth set out in the Local Plan.’ The … More SOLIHULL – INFRASTRUCTURE DELIVERY PLAN

Consultation event – proposed Dog Kennel Lane development:

Apologies for late notice re this drop-in event today but the consultation still has a week to go. Taylor Wimpey has launched a further consultation for Hares Croft, for new development at Dog Kennel Lane, Shirley. Land to the South of Dog Kennel Lane has been allocated in the Draft Solihull Local Plan as site … More Consultation event – proposed Dog Kennel Lane development:

Mell Square Masterplan promises transformative change for Solihull town centre

Press release from SMBC today: A transformative new masterplan for the regeneration of Mell Square in Solihull town centre has been unveiled. The exciting proposals have been put forward by Muse, the nationwide placemaker, working in partnership with Solihull Council. Muse was named preferred regeneration partner in October 2023. Speaking at the UK’s largest real estate investment … More Mell Square Masterplan promises transformative change for Solihull town centre

PLANNING APPLICATION – TYTHE BARN LANE

Planning application PL/2024/00728/PPFL refers to the ‘residential development of up to 90 dwellings, associated development including site infrastructure, associated works, landscaping, public open space, sustainable drainage system and vehicular access off Tythe Barn Lane/Field North Of Tythe Barn Lane Shirley Solihull’. The parcel of land forms the smaller part of site BL1 with the emerging Local … More PLANNING APPLICATION – TYTHE BARN LANE

WARD BOUNDARY CHANGES – SOLIHULL

The Local Government Boundary Commission has publishd their proposals they will now consult on. These can be found via this link (I have provided shortcuts further along this post): https://www.lgbce.org.uk/all-reviews/solihull Pretty well most wards are affected, certainly my own ward, Blythe, which is the largest ward in the borough. It has by far the largest … More WARD BOUNDARY CHANGES – SOLIHULL