Here is a round up of some of the work the Council has carried our last year (2020/2021).
SMBC is responsible for 632 miles of road
594 Potholes were repaired
62 speed awareness campaigns
Maintained a network of 28,998 streetlights
3,341 Street lights upgraded to LED
145 bollards de illuminated
56 signal-controlled junctions/100 pedestrian crossings operated and maintained
2.15km of footway reconstructed
2.1km footway slurry
